©Novel Buddy
Previous chapter:
Chapter 747: Arrival of rare metal minerals.
Next chapter:
Chapter 749: End of voyage.
PREVIEW
... sive hangar by a tractor. Then the engine room tailgate was opened and two Monster Laborers drove a giant forklift, transferring long, narrow crate lead containers one by one to the heavy trucks container ship, and a few hours later these cabinets in lead arrived at the Longxitan factory.
In the underground base, a rare metal purification plant with a very high degree of industrialization was established, it was not large, but its daily purification capacity was about 100 tons at mos ...
YOU MAY ALSO LIKE