©Novel Buddy
Previous chapter:
Chapter 123 before rubbing
Next chapter:
Chapter 125 chat
PREVIEW
... he made in the virtual laboratory.
During this period of time, the plant construction side was not idle, and the construction time of a steel-structured plant was still very fast.
Take out a factory building that has just been built, and install a smelting furnace and supporting equipment in it.
After the furnace was installed, just as he was about to start the preparation of materials, a series of things ordered for chip production also arrived one after another.
At ...
YOU MAY ALSO LIKE