©Novel Buddy
Previous chapter:
Chapter 437: A Silent Farewell
Next chapter:
Chapter 439: The Crime Scene
PREVIEW
... otor, a power supply unit, a boiler, and two water tanks. Together with the water tower outside the room, they formed the workings of the Tee Project system.
The steam engine pumped the water up into the water tower and the water tanks. The former was to provide the residential communities with water for domestic needs. The latter was the water supply for the boiler and the heating system. The first-level water tank was higher. Limestones and washing stones which were used to soften the wa ...
YOU MAY ALSO LIKE